The presence of a void under the tile, laminate , LVP, hardwood, glue down or engineered hardwood leads to cracks in the surface. It is much more difficult and time-consuming to lay material on poorly treated surfaces. Therefore, if in the near future you do not plan to spend energy, time and additional materials on repairing or altering the floor, special attention should be paid to the stage of preparing the surface for laying materials . Preparation of the floor for laying materials in each case will be the same, it is necessary to carefully study the general condition and reliability of the floor on which the materials are planned to be laid.
Add comment
Comments